Close

Search for a Glomacs Course by Keywords

Course Schedule
Classroom Sessions:
Date Venue Fees
23 - 27 Sep 2024 Dubai - UAE $5,950
Online Sessions:

23 - 27 Sep 2024 Online $3,950
Course Description

INTRODUCTION

In the development of a hydrocarbon reservoir, many wells are drilled and required to be completed, to allow the structure to be depleted. However, the drilling and completion operations are crucial to the long-term viability of the wells in meeting the specified objectives.

The design and completion of both production and injection wells are required to satisfy several objectives including:

  • Provision of optimum production/injection performance
  • Ensure safety
  • Maximize the integrity and reliability of the completion over the envisaged life of the completed well
  • Minimize the total costs per unit volume of fluid produced or injected, i.e.
  • Minimize the costs of initial completion, maintaining production and remedial measures

This GLOMACS training course on Well Completion Design will feature:

  • The main functions of completion
  • Developing a high-level completion strategy for wells in a variety of situations
  • Select tubing, packers, and completion flow control equipment
  • Understand different sand control techniques and their application

Objectives

By the end of this GLOMACS training course, participants will be able to:

  • Evaluate for a given reservoir scenario the bottom hole completion options and make a recommendation based on well integrity and reservoir management requirements
  • Identify, evaluate and recommend functional capability of completion strings for a variety of situations
  • Describe the purpose and generic operating principles for major completion equipment components
  • Identify limitation of well completion schematically designs and potential failure mechanisms / operational problems with equipment
  • Assess well safety requirements and capabilities inherent in well design
  • Describe the integration of the various stages of completing a well
  • List and flow chart a general procedure to run a completion string
  • Describe the requirements to pressure test and retain well control throughout the completion process
  • Define the need for full and accurate reporting and records to be kept

Training Methodology

This GLOMACS Well Completion Design training course will utilise a variety of proven adult learning techniques to ensure maximum understanding, comprehension and retention of the information presented. The daily workshops will be highly interactive and participative.

Organisational Impact

The organisation will gain in sending their employees to attend this GLOMACS training course, the following:

  • Reduction in the cost of the well and the proper selection of production string
  • Extending the well life and control it, achieve the optimum production
  • Ensuring the well integrity and avoiding all risks

Personal Impact

  • Obtain integrating knowledge of well completion design
  • Hone their knowledge and get the self-confidence in designing proper completion
  • Get the latest technology in well operations
  • Solving and avoiding the problems which impact on the optimum production, and well integrity

WHO SHOULD ATTEND?

This GLOMACS training course is suitable to a wide range of professionals but will greatly benefit:

  • Asset Managers
  • Petroleum Engineers
  • Production Technologists
  • Production Personnel (Production Operators, Maintenance Supervisors)
  • Drilling and Well Servicing Personnel (Drilling Manager, Drilling/Well Engineers, Completion and Well Service Engineers, Drilling Supervisors, Rig Manager, Toolpusher, Drillers)
Course Outline

DAY 1

Well Completion Design, Practices and Strategies

  • Introduction of Reservoir Drive Mechanism
  • Introduction into Artificial lift methods and their application
  • IPR and Productivity Index
  • Vertical Lift Performance
  • Well Outflow and Inflow Systems
  • Typical Vertical Lift Performance (VLP) for Various Tubing Sizes
  • Matching VLP Curves with an IPR Curve
  • Well Completion Design Considerations
  • Reservoir Considerations
  • Mechanical Considerations
  • Classification of Completions

DAY 2

Lower & Upper Completion String Components & Selection Consideration

  • Production Packer functions
  • Packers Types
  • Packers Generic Mechanisms
  • Permanent and Retrievable Packers
  • Locator Seals and Anchor Seals
  • Applications for Permanent and for Retrievable Packers
  • Setting Packers
  • Inflatable Packer Applications
  • Sliding Side Door Function
  • Gas Lift Mandrel
  • Running the Completion
  • Perforation Methods and Perforating Equipment
  • Perforation Selection and Conveying Methods

DAY 3

Wellheads / Sub-Surface Safety Valves & Flow Control Equipment

  • Wellheads Components, Function and Types
  • Subsurface Safety Valves Function
  • Safety Valves Types
  • Setting Depth of Subsurface Safety Valves Consideration
  • Surface Control Subsurface Safety Valves
  • Flow Control Devices
  • Nipple Profiles Types and Plug Selection
  • Workover Reasons
  • Well Killing Operations Technique and Consideration
  • Example for Workover Operations (Gas lift wells, Natural gas well, ESP well)

DAY 4

Overview of Sand Control Completion

  • Sandstone Formation Properties and Geology
  • What causes Sand Production?
  • Consequences of Sand Production Downhole and on Surface
  • What is the mean of sand control?
  • Perforation System for Non-sand Control Completion
  • Sand Control Options
  • Chemical Consolidation
  • Mechanical Sand Control Methods
  • Cased Hole Gravel Pack
  • Open Hole Gravel Packing
  • Expandable Screens
  • Gravel Pack Design, Gravel Sizing and Slot Sizing
  • Placement Methods
  • Carrier Fluid Concept
  • Choosing the Appropriate Method of Sand Control
  • Losses Controlling during Sand Control Operations
  • Perforating System for Sand Control
  • Standalone Screen Applications

DAY 5

Fundamentals of Rigless Operations Theory & Stimulation

  • Coiled Tubing Surface and Subsurface Components
  • Coiled Tubing Applications
  • Cleaning Operations with CT
  • Well Back Flow (nitrogen lift)
  • Wireline Types and Application
  • Surface and Subsurface Components of Wireline
  • Formation Damage Mechanisms and their Remediation
  • Stimulation Design Considerations
  • The Most Important Production Logging (PLT)
  • Well Barrier Philosophy during Well Interventions
Certificates
  • On successful completion of this training course, GLOMACS Certificate will be awarded to the delegates
  • Continuing Professional Education credits (CPE) : In accordance with the standards of the National Registry of CPE Sponsor, one CPE credit is granted per 50 minutes of attendance
Providers and Associations

Endorsed Education Provider

  • Quality Logo
  • Quality Logo

GLOMACS is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of continuing professional education on the National Registry of CPE Sponsors. State boards of accountancy have final authority on the acceptance of individual courses for CPE credit. Complaints regarding registered sponsors may be submitted to the National Registry of CPE Sponsors through its website: www.NASBARegistry.org

In Association With

PetroKnowledge

PetroKnowledge

Our collaboration with Petroknowledge aims to provide the best training services and benefits for our valued clients

Visit website

Options & Brochure
Related Categories

GLOMACS Training & Consultancy
Typically replies within an hour

Olivia
Hi there 👋
My name is Olivia. Please tell me how I can assist you..
1:40
×