Close

Search for a Glomacs Course by Keywords

Course Schedule
Online Sessions:

22 - 25 Apr 2024 Online $3,450
09 - 12 Sep 2024 Online $3,450
21 - 24 Apr 2025 Online $3,450
Course Description

INTRODUCTION

Cementing operations are critical for well life as they constitute the foundations of any gas or oil well. Well Integrity is compromised, unless efficient cementing operations are carried out in every casing job. Like the foundations of a house, Cementing is the basis for an efficient well performance.

This 4-day intensive Cementing Technologies training course will highlight:

  • Overview of Primary Cementing
  • Cement Placement (Job Execution and Procedures)
  • Cement Calculations
  • Cement Additives and Mud Removal
  • Effective Cement Placement
  • Cement Job Evaluation
  • HSE and Cementing

Objectives

By the end of this GLOMACS training course, participants will learn to:

  • Calculate Volumes of Cement, Mix Water and Additives
  • Understand the critical parameters for any cementing operation
  • Select displacement rates for effective mud removal
  • When to select Two Stage Cementing
  • Select the proper Additives based on Well Conditions
  • Read and perform Interpretation of Cement Bond Logs
  • Understand Special Cement Systems
  • Select Casing Hardware for successful Cementing Operations

Training Methodology

This online training course will utilize a variety of proven online learning techniques to ensure maximum understanding, comprehension, retention of the information presented. The training course is conducted Online via an Advanced Virtual Learning Platform in the comfort of any location of your choice

WHO SHOULD ATTEND?

This GLOMACS training course is suitable to a wide range of professionals but will greatly benefit:

  • Petroleum Engineers
  • Production Engineers
  • Drilling Engineers
  • Completion Engineers
  • Oil Field Technical Staff
Course Outline

DAY 1

Introduction to Cementing Operations

  • One stage cement jobs
  • Two stage jobs
  • Liner cementing
  • Squeeze cementing
  • Cement head and wiper plugs
  • Calculations: Volume of cement slurry, number of Sks, mix water, additives, displacement volumes required
  • Calculator for all parameters of the cement job
  • Pressures during and at end of displacement

DAY 2

Cementing Operations Planning and Execution

  • Buoyancy effect on casing
  • Relevant factors that influence the success of any cement job
  • Cement job planning and execution
  • Casing hardware
  • Cement chemistry (focus on class G cement)
  • Compressive strength and permeability
  • Strength retrogression
  • Thixotropic cement slurries
  • The importance of BHCT and BHST
  • Mud removal and the effect of mud contamination on compressive strength
  • Gas migration

DAY 3

Mud Removal and Cement Placement

  • Lost circulation
  • Cementing horizontal wells
  • Cement laboratory equipment
  • Rheology and its application in oil well cementing
  • Flow modules and mud removal
  • Spaces and washes
  • Cement placement: turbulent and laminar flow
  • Special cement systems
  • Engineered particle size cements
  • Salt cementing
  • Thixotropic cement systems
  • Light weight cements
  • Foam cement
  • Permafrost cement

DAY 4

Cement Quality Evaluation

  • Cement quality evaluation logs (cement bond logs)
  • Overview of sonic and ultrasonic logs
  • Examples of CBL/VDL Log displays and evaluation of cement quality
  • CBL VDL: pros and cons
  • The bond index
  • SCMT: slim cementing mapping tool
  • Ultrasonic tools: USIT
  • Ultrasonic log USIT over sonic log CBL
  • Cement logs summary
  • Examples of CBL/VDL log displays and evaluation of cement quality
  • Major hazards on a cementing operation
  • Risk assessment
  • Safety hazards related to a cementing operation
Providers and Associations

In Association With

PetroKnowledge

PetroKnowledge

Our collaboration with Petroknowledge aims to provide the best training services and benefits for our valued clients

Visit website

Options & Brochure
Related Categories

GLOMACS Training & Consultancy
Typically replies within an hour

Olivia
Hi there 👋
My name is Olivia. Please tell me how I can assist you..
1:40
×